AL Mojil Drug Company realizes the requirement of single roof operation to ease the communication, maintain the transaction accuracy, better management of inventory, reduce the time consumption, optimum utilization of resources and accommodate the new range of products.
AMD expected to acquire the warehouse with the capacity of minimum 10000(10K) square meter with different temperature zone. It should be a “state of art” warehousing facility with dedicated area for each purpose, various type of racking with barcoded labels, ERP system with RF capability (Radio Frequency), complete traceability, multiple docks with ramp, various MHE’s (Material Handling Equipment), 24/7 operations, offices for AMD & Supplier employees, meeting rooms, prayer rooms, break rooms, Training rooms and food court etc.